IAS VIP aircraft interior design project plan — BBJ ACJ design phases, cabin engineering and systems

As industry leaders in custom design and engineering solutions, IAS provides exclusive aviation services for VIP and VVIP aircraft including corporate shuttle, special mission, Head of State, private jet, and sports team aircraft. Our expert staff walks you through the entire process — from concept to build-out — ensuring the designs and final product meet your exact specifications. Our design expertise integrates with our VIP completion management services.

Interiors

  • Interior configuration development
  • World-class aircraft interior designers
  • Component design
  • Conceptual renderings (2D & 3D)
  • Fabric board presentations
  • Specification documentation
  • Specification control drawings
  • Exterior paint schemes
  • Design engineering / working drawings
  • FAA approvals and certification

Airframe

  • Conceptual airframe design
  • Airframe modification
  • Design engineering drawings
  • Composites design

Component Design

  • Cabinet and galley components
  • Seating
  • Lighting fixtures
  • Latches
  • Interior panel systems

Mechanical Systems

  • Heating, ventilation and air conditioning
  • Potable and grey water systems

Avionics Systems Integration

  • Wiring diagrams
  • Equipment installation drawings
  • Total systems integration

Electrical & Control Systems

  • Power and distribution systems
  • Emergency power and lighting systems

Propulsion Systems

  • Engine installation coordination

Audio / Video Entertainment

  • ICS (interphone communication systems)
  • Audio and video system design

Start Your Design

Bring Your Vision to Life

Whether you have a detailed brief or just an idea, IAS can take your VIP or VVIP aircraft interior design from concept to certified completion.

Contact Our Team
Call IAS  ·  1.561.809.8606